Waneta Expansion Generating Station
The Waneta Expansion project saw the construction of a 335 MW powerhouse immediately downstream of the existing Waneta Dam.
acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/columbiapowerpat/public_html/wp-includes/functions.php on line 6121health-check domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/columbiapowerpat/public_html/wp-includes/functions.php on line 6121columbiapower domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/columbiapowerpat/public_html/wp-includes/functions.php on line 6121The Waneta Expansion project saw the construction of a 335 MW powerhouse immediately downstream of the existing Waneta Dam.
The Brilliant Expansion Project saw the addition second powerhouse located immediately downstream of the Brilliant Dam on the Kootenay River.
The Arrow Lakes Generating Station Project saw the addition of a powerhouse located immediately downstream of BC Hydro’s water storage Hugh Keenleyside Dam on the Columbia River.
The Brilliant Dam and Generating Station were purchased in 1996 from Cominco (now Teck).