Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/columbiapowerpat/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the health-check domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/columbiapowerpat/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the columbiapower domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/columbiapowerpat/public_html/wp-includes/functions.php on line 6121
Corporate – Columbia Power

Corporate

Working Together with Leading Industry Partners

Columbia Power is pleased to work together with our industry partners. Since our inception we have proudly worked with Columbia Basin Trust to deliver our original mandate from the Province of BC. In the case of the Waneta Expansion Project, a third partner was added – Fortis Inc. In 2012 Columbia Power partnered with BC Hydro to complete the Arrow Lakes Boat Ramp Project. In the future we look forward to continuing to partner with BC Hydro, Fortis, Columbia Basin Trust and others.

View the links below to learn more about our corporate partnerships.

Back to Top